Woolim E&T Co., Ltd.

Presenting a future-oriented vision through continuous research and efforts in the environmental industry

 Indoor Air Quality Measurement

Multi-Use Facilities

■ Targeted Facilities

The constructor must submit the measurement results of the newly built apartment complex to the mayor, county governor, or district head no later than 7 days before residents move in.
The constructor of a newly built apartment complex must measure the indoor air quality of the apartment complex for which construction has been completed and must announce it so that residents can clearly see it in the following places for 60 days from 7 days before residents move in.

1. Bulletin board at the entrance of the apartment complex management office
2. Bulletin board at the entrance to each apartment building
3. Constructor’s Internet homepage

Type Sample collection household Scale
apartment using with more than 5 floors used as housing Over 100 households
townhouse The total floor area of ​​one building used as a residence exceeds 660㎡
Houses of 4 stories or less
dormitory Used for students or employees at schools or factories, etc.
Structure for communal cooking, etc.
Not in the form of an independent residence.
WordPress Table Plugin

 

■ Number of households for which test samples were collected

The number of households sampled in a newly built apartment complex is based on three households (low-rise, mid-rise, and high-rise) when the total number of households in the apartment is 100.
One generation is added for every 100 generations, and samples are collected up to 20 generations.
(Radon measurement can be conducted up to 12 households) At this time, it increases in the order of mid-rise, low-rise, and high-rise.

100~199 Sample collection household
100 ~199 3rd generation
200 ~ 299 4th generation
300 ~ 399 5th generation
WordPress Table Plugin

 

■ Measurement standards and test methods (applied from July 1, 2019)

Type Sample collection household volatile organic compounds Radon (Bq/㎥)
benzene
(㎍/㎥)
toluene
(㎍/㎥)
ethylbenzene
(㎍/㎥)
xylene
(㎍/㎥)
styrene
(㎍/㎥)
Recommended standards 210 or less 30 1000 360 700 300 148
measurement method Collected by adsorption onto DNPH
Tenax tube using a collector
(Measure twice for 30 minutes at a flow rate of 200 to 1000 mL/min)
Collected by adsorbing onto
Tenax tube using a collector
(Measure twice for 30 minutes at a flow rate of 50 to 200 mL/min)
Short-term measurement with a collector
(3 days)
Analysis method HPLC method GC/MS method Radon continuous measurement method
WordPress Table Plugin

 

■ Sampling conditions (HCHO, VOC)

 

Sampling conditions (radon)

Measurement inquiries and consultations

If you contact Woolim E&T Co., Ltd.,Investigator in charge will provide friendly advice.

Write a test request form

Through consultation, the measured contaminants are confirmed and a test request form is written and submitted.

On-site sampling and measurement

Samples are collected and measured in accordance with indoor air quality process testing standards.

Sample analysis and records
writing

After receiving the sample, the researcher in charge prepares an accurate test analysis and measurement record.

Issuance of test report

(After payment of the measurement fee) We will compile the measurement and analysis results and send you a test report directly or via mail.

TEL. 063-453-4112   /   FAX. 063-453-4115   /   E-mail.ulrimeti33@naver.com

en_USEnglish
Scroll to Top