Woolim E&T Co., Ltd.

We have specialized staff with experience, experience, and passion with specialized technology.

 Construction Performance Status

We will provide the optimal service to solve our customers' environmental management problems using the environmental management know-how accumulated over many years by our Technologies experts.

공사실적 현황_new
NoConstructionOrdererInstallation locationDelivery date
121Chemical piping during dredging and cleaning of Daegu food processing facilityTechcross Environmental ServiceDaegu city2021.02
122Mechanical installation work during structural construction (other existing facility improvement work)Techcross Environmental ServiceDaegu food waste treatment plant2021.02
123Gunsan Industrial Complex 2 wastewater site separation membrane (B series) cleaningDaehyun E&SGunsan Wastewater Treatment Plant2021. 03
124Post-treatment bag filter replacement work and duct chamber cleaningIljin Steel Co., Ltd.Iljin Steel Co., Ltd.2021.03
125Centrifugal dust collector installation work (500㎥/min)DS Timber Co., Ltd.DS Timber Co., Ltd.2021.03
126Centrifugal force dust collector installation work (300㎥/min)Taesung Wood Co., Ltd.Taesung Wood Co., Ltd.2021.03
127Centrifugal dust collector installation work (250㎥/min)Haesung Timber Co., Ltd.Haesung Timber Co., Ltd.2021.03
128Centrifugal dust collector installation work (250㎥/min)Baeksan WoodBaeksan Wood2021.03
129Centrifugal force dust collection equipment installation work (250㎥/min)Taejin Wood Co., Ltd.Taejin Wood Co., Ltd.2021.04
130Centrifugal force dust collection equipment installation work (180㎥/min)Good woodGood wood2021.04
131Cleaning dust collection facility installation work (250㎥/min)Sungjin Polymer Co., Ltd.Sungjin Polymer Co., Ltd.2021.04
132Filtration dust collection facility installation work (150㎥/min)GS MetalGS Metal2021.04
133Ultramembrane cleaning workGunsan Wastewater Terminal Treatment PlantGunsan Wastewater Terminal Treatment Plant2021.05
134Filtration dust collection facility installation work (300㎥/min)Daishin Renewable IndustryDaishin Renewable Industry2021.05
135Centrifugal force dust collection facility installation work (200㎥/min)Seung OudSeung Oud2021.05
136Filtration dust collection facility installation work (400㎥/min)Gunjang recycling cycleGunjang recycling cycle2021.05
137Painting booth and adsorption tower installation work (400㎥/min)Wooseok Engineering (Tata Daewoo primary vendor)Wooseok Engineering 2021.06
138Digestion tank transfer pipe repair workGunsan Sewage Treatment PlantGunsan Sewage Treatment Plant2021.06
139Wastewater discharge facility reporting rental serviceDongwoo Farm to Table Co., Ltd.Dongwoo Farm to Table Co., Ltd.2021.06
140Glass shop wastewater treatment equipmentGwangyeoldangGwangyeoldang2021.06
141Glass shop wastewater treatment equipmentSeawell OpticianSeawell Optician2021.06
142Delivery and installation of filters, dehydrators, chemical pumps, etc.Farmers Food Co., Ltd.Farmers Food Co., Ltd.2021.07
143Production and installation of local ventilation facilities for the grinding processSangwon IML Co., Ltd.Sangwon IML Co., Ltd.2021.07
144Expanded separation membrane pretreatment equipment screw canvas air reduction shaft repair and piping improvement repairEnvironmental Facility Management Co., Ltd.Environmental Facility Management Co., Ltd.2021.07
145Pen Balancing and Bearing ReplacementKorea TV Co., Ltd.Korea TV Co., Ltd.2021.07
146Digester B series concentrated sludge supply pipe replacementTechcross Environmental Service Co., Ltd.Techcross Environmental Service Co., Ltd.2021.08
147Post-treatment duct chamber cleaning and duct installation workIljin Steel Co., Ltd.Iljin Steel Co., Ltd.2021.08
148Wastewater treatment plant repair workDio Electronics Co., Ltd.Dio Electronics Co., Ltd.2021.08
149Environmental approval and permit rental services, etc.Daeseung Industrial Co., Ltd.Daeseung Industrial Co., Ltd.2021.08
150Wastewater treatment plant installation work (150 tons/day)Daewoo Engineering & ConstructionIljuk Sewage Treatment Plant2021.09
en_USEN
Scroll to Top